Operations Hub Episode 5: Change Orders

Tune into the latest installment of SMACNA's management podcast to learn more about the challenges posed by project changes and the best practices for navigating unexpected events.

For the latest episode of the Operations Hub, Seth Lennon is joined by Ashley Duncan (General Sheet Metal) and Joe Samia (General Consolidated) for an in-depth discussion on the impact of change orders. The panel outlines some of the challenges posed by changes that occur during a project and some of the best practices that can be utilized when something unexpected happens.

Listen Here


Oct 9, 2024 Member Update

Latest Articles


SMACNA Supports Senate Resolution to Halt Canadian Tariffs

Apr 1, 2025 - S.J. Res 37, introduced with bipartisan support by Senators Tim Kaine and Rand Paul to halt the national emergency that was declared to justify tariffs on imports from Canada.


Aaron Hilger Interviewed for National Careers in Trades Week!

Apr 1, 2025 - SMACNA’s CEO speaks with the media about the for young people in a prosperous career in the skilled trades.


Tom Martin joins Angie Simon on Let’s Talk Shop

Apr 1, 2025 - Learn more about the SMACNA President’s industry journey and his priorities for the presidency.