Change Orders

Oct 9, 2024|Episode 5

For the latest episode of the Operations Hub, Seth Lennon is joined by Ashley Duncan (General Sheet Metal) and Joe Samia (General Consolidated) for an in-depth discussion on the impact of change orders. The panel outlines some of the challenges posed by changes that occur during a project and some of the best practices that can be utilized when something unexpected occurs. 

Latest from this Series


Exception occured while executing the controller. Check error logs for details.